East Kentucky Power Cooperative has been awarded a permit from the Kentucky Division of Air Quality for two new generating units at the J.K. Smith Station in Clark County. The two new units are expected to be online by Oct. 1, 2009, at a cost of about $80 million apiece. Together, the two new units will have the capacity to generate about 200 megawatts of power, or enough electricity to power 110,000 Kentucky homes. The units, fueled by natural gas, are designed to provide power during periods of high usage, such as very cold and very hot days when heating and air-conditioning systems use large amounts of power.
Winchester
You may also like
Popular Stories
The Lane Report
- General Fund and Road Fund receipts reported for fiscal year 2025
- PSC and KCTCS join forces with new PSC 811 Damage Prevention Scholarship
- Crave Hot Dogs & BBQ launches inside Louisville Walmart
- Crunch Fitness brings state-of-the-art fitness facility to Lexington
- Gov. Beshear announces $14.4 million to improve infrastructure damaged in 2022 floods
- BreyerFest 2025: Cheers to 75 Years of Horse Magic at the Kentucky Horse Park
- 8 Kentucky companies awarded nearly $750,000 to continue technology development in the Commonwealth
- Op-Ed: Proposed Federal cuts hurt KET
- New study reveals which metro areas have the most and least disposable income in Kentucky
- Saint Joseph London pulmonologist performs first robotic-assisted bronchoscopy
Add Comment